Deck Cost in Maryland: What a Deck Costs in Anne Arundel & Howard County
By Anton Sergeev, Owner — MHIC #113057
How much does a deck cost in Maryland?
A new deck in Anne Arundel and Howard County, Maryland typically costs $22,000–$38,000 installed by PRG Home Improvement. Re-deck on a sound frame, or a basic ground-level pressure-treated deck starts around $10,000; elevated, multi-level or premium deck with lighting and engineered details reaches $65,000. Prices reviewed September 7, 2026.
Want a real number for your deck?
Leave your name and phone. Anton — the owner, not a call center — calls back within one business day with a ballpark for your home.
Call 443-856-5379These are installed prices from PRG Home Improvement, a licensed Maryland deck builder (MHIC #113057) working in Anne Arundel and Howard County. They cover labor, standard materials, footings, permit handling and inspections. They are not national averages and they are not a marketplace estimate.
The tiers below are how we actually scope deck projects. Most homes land in the typical tier; the low tier is for a sound existing frame or a simple ground-level pressure-treated build, and the high tier is elevated, multi-level, or finished with premium rail and lighting.
Deck Building cost by tier
Installed prices: labor, standard materials, permit handling and inspections. The right-hand column is what puts a project in that tier.
| Tier | Project | Installed cost | What puts a project here |
|---|---|---|---|
| Low | Re-deck on a sound frame, or a basic ground-level pressure-treated deck Existing frame reused, or a simple rectangular pressure-treated deck close to grade with one stair. | $10,000–$25,000 |
|
| Typical | New composite deck, walkout height, one stair A new pressure-treated frame with composite decking and composite or aluminum rail, built at walkout-basement or first-floor height. | $22,000–$38,000 |
|
| High | Elevated, multi-level or premium deck with lighting and engineered details Second-story or multi-level decks, PVC or premium composite, cable or glass rail, integrated lighting, and engineering where the county requires it. | $32,000–$65,000 |
|
What a quote includes, and what is commonly left out
The gap between two quotes is usually in this list, not in the labor rate. Ask any contractor for both columns before comparing numbers.
Low tier — Re-deck on a sound frame, or a basic ground-level pressure-treated deck ($10,000–$25,000)
Included in a PRG quote
- Removal and disposal of the old decking and rail
- New pressure-treated decking and rail system
- Footings, framing, ledger flashing and structural hardware on a new build
- Permit application and inspection scheduling
Commonly excluded, quoted separately
- Repairs to an existing frame that fails inspection (undersized footings, missing hardware, rot)
- Lighting or any electrical work
- Stain or sealer, which pressure-treated lumber cannot take until it has dried
- Grading, drainage or landscaping repair around the deck
Typical tier — New composite deck, walkout height, one stair ($22,000–$38,000)
Included in a PRG quote
- New footings poured to county frost depth and inspected before the pour
- Pressure-treated frame with joist hangers, post-to-beam hardware and a flashed ledger
- Composite decking, hidden fasteners, composite or aluminum rail, one stair
- Permit drawings, permit application and all inspections
Commonly excluded, quoted separately
- Deck lighting and outlets (an electrical sub-permit and a licensed electrician)
- Privacy screens, benches, planters and other built-ins
- Under-deck drainage or a finished ceiling below
- A roof or screen enclosure, which is priced in the screened porch guide
High tier — Elevated, multi-level or premium deck with lighting and engineered details ($32,000–$65,000)
Included in a PRG quote
- Everything in the typical tier
- Electrical work by a licensed electrician under its own permit
- Engineered drawings when required, and the plan-review coordination that comes with them
- Premium rail systems and multi-level framing
Commonly excluded, quoted separately
- Outdoor kitchen appliances, gas lines and countertops
- Structural reinforcement for a hot tub, which is quoted after a load review
- Roof structures and screen enclosures
Line items outside the tiers
| Item | Cost | When it applies |
|---|---|---|
| Engineered drawings (when the county requires them) | $800–$2,500 | A Maryland-licensed structural engineer stamps the framing plan. Triggered by elevated or large decks, unusual ledger conditions, or a future roof load. |
Permits, inspections and HOA review in Anne Arundel and Howard County
Anne Arundel County
Anne Arundel County Office of Inspections and Permits
Building permit fee: $150–$500
- A building permit is required for any deck attached to the house, whatever its size. Detached platforms have their own thresholds; assume a permit until the county says otherwise.
- The application needs a site plan showing setbacks, a framing plan with post, beam and joist sizes, the ledger attachment detail, and guard and stair details.
- Lots in the Chesapeake Bay Critical Area (many Annapolis, Severna Park, Pasadena and Edgewater properties near tidal water) get an additional review layer before the building permit is issued.
- Lighting or outlets on the deck add an electrical sub-permit.
Howard County
Howard County Department of Inspections, Licenses and Permits (DILP)
Building permit fee: $200–$600
- A building permit is required for new decks and for replacing an existing deck, even on the same footprint: the county verifies footings, framing and guards against current code.
- Howard County asks for stamped engineering drawings on some larger or elevated decks and on unusual ledger conditions.
- Columbia properties usually need village architectural committee approval for an exterior change before or alongside the permit.
- Lighting or outlets on the deck add an electrical sub-permit.
Inspection sequence
- Footing inspection. Holes are dug and left open. The inspector checks depth below the county frost line, diameter and bearing soil before any concrete is poured. Pouring first means digging them out again.
- Framing inspection. Before decking covers the frame: ledger flashing and fasteners, post-to-beam hardware, joist hangers, beam sizes and spans against the approved drawings.
- Electrical rough-in and final. Only when lighting or outlets are part of the job, under the electrical sub-permit.
- Final inspection. Guard height and baluster spacing, stair rise and run, handrail, and that the built deck matches the permitted plan.
HOA review
Many Anne Arundel and Howard County communities require architectural review for a new deck or a visible change to one. Crofton, Severna Park, Two Rivers and the Columbia villages are the ones we deal with most.
HOA review runs alongside the county permit, not instead of it. Some associations want their approval in hand before the county application is filed, so we ask about the HOA at the first site visit.
Footing inspection and deck permit requirements in Anne Arundel and Howard County
Both counties inspect deck footings while the holes are open. We dig, call the inspection, and pour only after the inspector has signed off on depth and diameter. A deck that skips this step has no way to prove its footings later, which matters at resale and matters more when a frost heave lifts a post.
The permit drawing is the contract with the inspector. It fixes post spacing, beam size, joist span, the ledger detail and the guard system; a change on site that is not on the drawing gets caught at framing or final. That is why a PRG quote includes the drawings and the inspection scheduling rather than leaving them to the homeowner.
Replacing a deck on the same footprint still needs a permit in both counties. The frame that was compliant when it was built is judged against current code, and the most common failures on old frames are shallow footings, an unflashed ledger and posts sandwiched beside a beam instead of carrying it. Those are the items that move a re-deck out of the low tier.
Full breakdown: sizes, materials, line items and hidden costs
The detail behind the tiers. Figures here are PRG's published prices for the same work and are reviewed on the same date as the tiers above.
Average Cost of a Deck by Size
Size is the biggest single cost driver, but it's not linear — a 400 sq ft deck doesn't cost twice as much as a 200 sq ft deck because permits, mobilization, and the ledger/flashing detail are shared fixed costs. Here are typical Anne Arundel and Howard County prices for a new build with one set of stairs.
| Deck size | Square footage | Pressure-treated | Mid-tier composite | Premium (PVC, cable rail) |
|---|---|---|---|---|
| 8×10 | 80 sq ft | $7,500 – $11,000 | $10,500 – $14,500 | $13,000 – $18,000 |
| 10×12 | 120 sq ft | $9,500 – $14,000 | $13,500 – $18,500 | $16,500 – $23,000 |
| 12×16 | 192 sq ft | $14,000 – $20,000 | $20,000 – $28,000 | $25,000 – $35,000 |
| 12×20 | 240 sq ft | $17,000 – $24,000 | $24,000 – $34,000 | $30,000 – $42,000 |
| 14×20 | 280 sq ft | $19,500 – $28,000 | $28,000 – $38,000 | $34,000 – $48,000 |
| 16×20 | 320 sq ft | $22,000 – $32,000 | $32,000 – $44,000 | $40,000 – $55,000 |
| 20×20 | 400 sq ft | $27,000 – $38,000 | $38,000 – $54,000 | $48,000 – $68,000 |
| 20×24 | 480 sq ft | $31,000 – $44,000 | $45,000 – $62,000 | $56,000 – $80,000 |
The sweet spot for most Maryland homes is 12×20 to 14×20 — large enough for a dining table or seating group plus a grill zone, small enough to keep framing and stair geometry simple.
Cost per Square Foot for a Deck in Maryland
Deck builds in Maryland run $30 to $120 per square foot depending on material, height, and railing system. Most projects in Anne Arundel and Howard Counties land in the $55–$80/sq ft range for a mid-tier composite build.
| Build tier | Cost per sq ft |
|---|---|
| Re-deck on existing frame (PT surface) | $30 – $45 |
| Re-deck on existing frame (composite surface) | $45 – $70 |
| Basic new build (PT, ground-level, basic railing) | $30 – $50 |
| Standard composite (mid-grade, basic aluminum balusters) | $55 – $80 |
| Mid-tier composite (premium board, aluminum railing) | $70 – $100 |
| Premium PVC or hardwood with cable / aluminum railings | $85 – $120 |
| Multi-level or elevated (10+ ft) with premium finishes | $100 – $160+ |
Smaller decks (under 150 sq ft) typically cost more per square foot because fixed costs — permits, mobilization, the ledger flashing detail, footing inspections — don't scale down proportionally.
Cost of a Deck by Material
| Material | Installed cost per sq ft | Lifespan in MD | Maintenance | Best for |
|---|---|---|---|---|
| Pressure-treated pine (PT) | $12 – $22 | 15–25 yrs | Annual cleaning + stain/seal every 2–3 yrs | Budget builds, framing |
| Cedar | $18 – $30 | 15–20 yrs | Annual cleaning + sealing | Aesthetics on a moderate budget |
| Standard composite (Trex Enhance, TimberTech Pro, Fiberon) | $25 – $42 | 25–30 yrs | Periodic cleaning only | Most Maryland new builds |
| Premium composite (Trex Transcend, TimberTech AZEK) | $35 – $58 | 30–50 yrs | Periodic cleaning only | Premium look, lifetime ownership |
| PVC (Azek, TimberTech AZEK Vintage) | $40 – $65 | 30–50 yrs | Periodic cleaning only | Pool decks, moisture-prone sites |
| Tropical hardwood (ipe, cumaru, mahogany) | $40 – $70 | 25–40 yrs | Annual oiling for color retention | High-end aesthetic, natural look |
| Aluminum decking | $50 – $90 | 40+ yrs | Almost none | Rooftop and elevated decks |
For most Anne Arundel and Howard County homes, mid-tier composite is the right call. Maryland's humidity, freeze-thaw cycle, and Chesapeake Bay salt air are hard on wood — a PT deck that looks great year one will need staining year three and board replacement by year fifteen. Composite typically costs 50–80% more upfront but eliminates 25 years of maintenance costs. For a 300 sq ft deck, the lifetime cost of ownership over 20 years is usually within $2,000–$5,000 between composite and PT once you factor in maintenance — and composite still looks new at year 20.
If you want more detail on the trade-off, see my composite vs wood decks for Maryland breakdown.
What Does Each Part of a Deck Cost?
Here's how a typical deck breaks down by line item. Prices are for a standard 240 sq ft (12×20) deck at 3–4 feet off the ground with one stair run.
Foundation and framing
| Item | Cost |
|---|---|
| Footings (poured concrete, 30" frost depth, per footing) | $250 – $500 |
| Footings, helical pier system (per pier) | $400 – $750 |
| PT framing lumber (joists, beams, rim, ledger) | $1,800 – $3,500 |
| Hurricane ties and tension ties (IRC R507 hardware) | $200 – $500 |
| Ledger board flashing and proper attachment | $400 – $900 |
| Joist tape (membrane over joist tops to prevent rot) | $150 – $300 |
The ledger-to-house attachment is the single most important structural detail on the entire deck. A ledger that's not properly flashed will leak water behind your siding for years before you see the damage. Hurricane ties and tension ties are required by Maryland's adopted IRC code (R507) — they're not optional, and they're not what gets cut on a low-bid quote. See my post-to-beam connection guide for the specific hardware I use and why.
Decking surface
| Item | Cost per sq ft (240 sq ft deck) |
|---|---|
| PT 5/4×6 decking, screwed | $12 – $18 |
| Composite, top-down screw | $25 – $35 |
| Composite or PVC with hidden fasteners (clip system) | $30 – $45 |
| Diagonal or chevron pattern (any material) | +$3 – $8/sq ft over straight layout |
| Picture-frame border | +$300 – $700 total |
| Inlay or pattern feature | +$500 – $1,500 total |
Hidden fasteners are worth the upcharge on composite — top-down screw on composite shows the screw heads, which looks fine in a brochure photo but reads cheap up close. The clip systems (Camo, Trex Hideaway, TimberTech Concealoc) are what every premium build uses.
Railings
| Railing type | Cost per linear foot installed |
|---|---|
| Pressure-treated wood rail with wood balusters | $30 – $55 |
| PT wood rail with aluminum balusters | $50 – $80 |
| Composite top/bottom rail with aluminum balusters | $70 – $110 |
| All-aluminum railing system (Westbury, Fortress, Trex Signature) | $90 – $140 |
| Glass panel railing | $140 – $250 |
| Cable railing (stainless steel cables, wood or aluminum posts) | $130 – $220 |
For a typical 240 sq ft deck with railings on three sides (~48 linear feet), that's $1,500 in PT rail at the low end to $11,000 in cable rail at the high end. The most common choice in Anne Arundel and Howard County is composite top/bottom rail with aluminum balusters at $75–$95/lf — durable, low-maintenance, and looks clean without the cost of cable.
Stairs
| Item | Cost |
|---|---|
| Standard single stair run (3–4 risers) | $1,200 – $2,500 |
| Single stair run (5–8 risers, 4–6 ft drop) | $2,200 – $4,500 |
| Stair run (9+ risers, elevated decks) | $4,000 – $7,500 |
| Stair landing platform | $800 – $2,500 |
| Stair lighting (riser lights, per riser) | $80 – $150 |
Stairs are the place where corner-cutting shows up first. Risers must be uniform within 3/8" per code, and the stair stringer attachment to the deck frame must use proper hardware (not toenailed). A bad stair fails inspection — and worse, it fails the homeowner.
Lighting and electrical
| Item | Installed cost |
|---|---|
| Low-voltage transformer + 4–6 post cap lights | $400 – $900 |
| Low-voltage stair riser lights (per riser) | $80 – $150 |
| Under-rail accent lighting (per linear foot) | $25 – $50 |
| 120V outlet with GFCI (deck-mounted) | $250 – $450 |
| Dedicated 20A circuit from panel | $400 – $900 |
| Outdoor smart lighting controller (Lutron, etc.) | $300 – $700 |
For most homeowners a basic lighting package (transformer, post caps, a few stair lights) runs $800–$1,500. Premium full-deck lighting with riser lights, under-rail accents, and smart control runs $3,500–$6,000.
Add-ons and built-ins
| Add-on | Installed cost |
|---|---|
| Built-in bench (per linear foot) | $200 – $400 |
| Built-in planter box | $400 – $1,200 each |
| Pergola attached to deck (PT) | $3,500 – $7,500 |
| Pergola attached to deck (cedar or composite-wrapped) | $6,000 – $14,000 |
| Outdoor kitchen rough-in (gas + electric stubbed) | $1,500 – $4,000 |
| Hot tub pad framing (reinforced for ~5,000 lb load) | $1,200 – $3,500 |
| Privacy screen / lattice wall | $400 – $1,200 per panel |
| Deck skirting (lattice or board) | $20 – $45 per linear foot |
| Gas line for grill (from house gas meter) | $800 – $2,200 |
| Fire pit area framing (non-combustible base) | $600 – $2,000 |
| Conversion to screened porch later (add roof + screens) | $20,000 – $45,000+ |
If you're considering a screened porch eventually, build the deck frame to porch-load specifications from day one — it's significantly cheaper than retrofitting later. See my Maryland screened porch cost guide for the conversion math.
What Percent of a Deck Is Labor?
Labor accounts for 50–70% of total cost on most Maryland deck builds. On a $28,000 composite deck, that's $14,000–$19,500 in labor and the rest in materials, permits, and overhead. Custom features — diagonal patterns, picture-frame borders, cable railings, built-ins — push labor toward the high end. A simple straight-board PT deck pushes it toward the low end.
Skilled framing labor in Maryland runs $55–$75 per hour for an experienced lead carpenter; helpers $35–$55. A two-person crew on a typical 12×20 build will spend roughly 60–90 labor hours from footing pour through final railing detail.
Hidden Costs and Common Surprises on Deck Projects
This is the section the aggregators and design-build firms don't write because they're not the ones discovering it on demo day. After framing and rebuilding decks across Anne Arundel and Howard Counties, here's what regularly shows up:
| Surprise | Typical added cost |
|---|---|
| Rotted ledger board behind house siding (almost always missing proper flashing) | $1,500 – $4,500 |
| Existing ledger never properly attached — through-bolts missing or undersized | $800 – $2,500 |
| Rim joist rot at house attachment | $1,200 – $3,500 |
| Existing footings shallower than 30" frost depth (re-pour required) | $400 – $900 per footing |
| Existing footings undersized for new load | $300 – $700 per footing |
| Concrete-encased posts that have rotted at grade (very common on 1990s decks) | $500 – $1,500 per post to remove and re-set |
| Tree root conflict at proposed footing location | $400 – $1,500 to relocate or hand-dig |
| Septic field setback (rural Anne Arundel and Howard properties) | $0 – $5,000+ depending on options |
| HOA architectural review (common in Crofton, Severna Park, Two Rivers, Stillview Acres, Sabrina Park) | $0 – $500 + 2–8 week delay |
| Site grading or drainage issue requiring solution | $800 – $3,500 |
| Power line clearance issue requiring relocation | $1,500 – $5,000+ (utility coordination) |
| Knob-and-tube wiring discovered when running new circuit (older Annapolis/Edgewater homes) | $1,500 – $4,000 |
| Existing siding damage when removing old ledger | $600 – $2,500 |
A good contractor builds a 10–15% contingency into your budget for exactly these surprises. If your estimate is $25,000, plan for $28,000 available. Every contract I write defines the change-order process up front — if something shows up that wasn't visible at the estimate, you see the cost, you approve it, and the work moves forward.
Re-Deck vs. New Build: When You Can Save Significantly
If your existing deck frame is structurally sound — proper ledger attachment, proper footings at 30" depth, hardware in place, no rot in joists or rim — you can re-deck rather than rebuild. This means stripping the old surface and railings, replacing them with new boards and a new railing system, and keeping the frame.
Typical re-deck pricing in Anne Arundel and Howard County:
| Re-deck scope | Cost per sq ft | Example: 240 sq ft deck |
|---|---|---|
| PT surface and PT railings | $30 – $42 | $7,200 – $10,000 |
| Composite surface and composite railing | $50 – $70 | $12,000 – $17,000 |
| Composite surface with aluminum baluster railing | $60 – $80 | $14,500 – $19,500 |
| Composite with cable railing | $75 – $100 | $18,000 – $24,000 |
I recently bid a 390 sq ft chevron-pattern PT re-deck with IRC R507 hardware retrofit, new railings, and new stairs at around $13,500–$14,500 — keeping the existing frame and bringing it to current code. That's a fraction of what a full rebuild of the same deck would cost ($25,000–$35,000).
The catch: not every frame is salvageable. A frame that's already rotted, has shallow footings, or was built before the hurricane-tie code update typically can't be re-decked without code-compliance work that costs nearly as much as a rebuild. I do a free inspection of existing framing during the consultation and tell you straight whether re-decking makes sense or whether you're better off starting over.
How Long Does It Take to Build a Deck in Maryland?
From the first conversation to a finished deck, plan for 6 to 12 weeks total in Anne Arundel and Howard Counties.
| Phase | Typical duration |
|---|---|
| Initial consultation and estimate | 1–2 weeks |
| Design refinement and material selections | 1–2 weeks |
| Permit application and review | 2–6 weeks (Anne Arundel 2–4, Howard 3–6) |
| HOA architectural review (if required) | 2–8 weeks (parallel with permits) |
| Material lead times (composite, cable rail, premium materials) | 1–4 weeks (parallel) |
| Footings and frame inspection | 3–5 days |
| Framing and decking | 4–8 days |
| Railings, stairs, finish details | 3–6 days |
| Final inspection | 1–2 days |
Active construction time is typically 2 to 3 weeks for a standard build. Material lead times for cable railings, premium composite, or specialty hardwood can extend the overall timeline.
Does a Deck Add Value in Maryland?
Yes. According to the 2026 Cost vs. Value Report from Remodeling Magazine and Zonda, deck additions recover 60–72% of their cost at resale nationally, with the mid-Atlantic region tracking near the top of that range. Wood decks recover slightly more on a percentage basis upfront (lower investment), while composite decks recover slightly less percentage but are viewed more favorably by buyers because of the zero-maintenance pitch.
| Project cost | Typical resale value added in MD | Effective ROI |
|---|---|---|
| $18,000 PT deck | $12,000 – $14,500 | 67–80% |
| $30,000 composite deck | $20,000 – $23,500 | 67–78% |
| $50,000 premium build | $30,000 – $36,500 | 60–73% |
Higher-end builds recover a lower percentage because luxury features above neighborhood comp expectations are the part buyers won't fully pay for. That said, a well-built deck almost always outperforms most interior renovations on ROI percentage. In strong Maryland submarkets like Severna Park, Crofton, Annapolis, Davidsonville, and Clarksville, return tends to hit the top of the range.
How to Save Money on a Deck in Maryland
- Re-deck if your frame is sound. $13,000–$18,000 for a composite re-deck versus $28,000+ for a full rebuild of the same footprint.
- Pick a simple rectangle. L-shapes, multi-levels, and curves add 15–35% in labor without proportional usable space.
- Build at grade if possible. Elevated decks (4+ ft off the ground) need bigger footings, longer posts, and code-required railing systems. A ground-level deck off a walkout basement is the cheapest scope.
- PT framing + composite surface is the sweet spot. Composite framing is a waste of money — framing isn't exposed to UV or rain in a way that matters once the surface is on.
- Choose composite railing with aluminum balusters, not cable. Looks 90% as clean for 50% of the price.
- Run electrical during the build, not after. Adding outlets and lighting after the deck is built means tearing out fascia and crawling under. Plan it in.
- Hire an owner-operator licensed contractor. Design-build firms with showrooms add 15–25% overhead. For a 200–300 sq ft deck in Anne Arundel or Howard County, that's a real number.
- Don't cut on the ledger or the footings. This is where every cheap deck eventually fails. Ledger flashing and proper footings cost a few hundred dollars more and save you a structural rebuild ten years out.
How to Finance a Deck in Maryland
Most Maryland homeowners pay for a deck through one of three routes:
- Home equity line of credit (HELOC). Usually the cheapest financing for projects in this range. Interest is variable but typically lower than personal loans, and interest may be tax-deductible if used for home improvement (consult your tax preparer).
- Cash-out refinance. Worth considering only if current mortgage rates are at or below your existing rate.
- Home improvement loan (unsecured personal loan). Faster to close than a HELOC, fixed rate, but higher interest. Reasonable option if you don't have home equity yet.
PRG doesn't offer in-house financing, but most clients pay by check or ACH on a milestone schedule: deposit, mid-project, and final upon completion. I can provide detailed estimates suitable for loan applications.
Get a real number for your deck
The tiers above are how PRG scopes deck projects, and the ranges are our installed prices. The number for your home depends on what is already there and what you choose. Describe the project to the AI estimator for a range now, or book an in-home estimate for a line-item quote.
Describe your project to the AI estimator →Deck Building cost questions
- How much does a deck cost in Maryland?
- In Anne Arundel and Howard County, most new composite decks PRG builds run $22,000 to $38,000 installed. A re-deck on a sound frame or a basic ground-level pressure-treated deck starts around $10,000, and an elevated, multi-level or premium deck with lighting reaches $65,000. Prices reviewed September 7, 2026.
- What is included in a deck quote from PRG?
- Footings, the pressure-treated frame with hardware and a flashed ledger, decking, rail, one stair, the permit drawings and application, and every county inspection. Lighting, built-ins and a roof are quoted as separate line items so you can see what each one costs.
- Do I need a permit to build or replace a deck in Anne Arundel or Howard County?
- Yes in both counties, for a new attached deck and for replacing one on the same footprint. Anne Arundel County permits run through the Office of Inspections and Permits; Howard County through DILP. PRG prepares the drawings and pulls the permit as part of the job.
- What is a footing inspection and why does it matter for the price?
- The county inspects the footing holes before concrete goes in, checking depth below frost line and diameter. It is one of the fixed costs of a deck that does not shrink with the deck size, which is why very small decks cost more per square foot than the typical tier.
- What makes a deck move from the typical tier to the high tier?
- Height and complexity. A second-story deck needs longer posts, larger footings and a longer stair; multiple levels or curves add framing; PVC decking, cable or glass rail and integrated lighting add material and a separate electrical permit; and the county may require engineered drawings.
- How do I get a real number for my deck?
- Describe the deck to the AI project estimator for a range in a few minutes, or call 443-856-5379 for an in-home estimate. The owner measures the site, checks the existing frame if there is one, and writes a line-item quote.
Who Will Run Your Project
Anton Sergeev — Owner & Lead Craftsman
- MHIC #113057 — licensed & insured in Maryland. Verify license →
- Hands-on in construction since 2010 — electrician, property management, then custom home builders. MHIC licensed since 2017.
- Anton personally performs or supervises the critical finish work on every project — you work with the owner from estimate to final walkthrough.
- Trusted, licensed subcontractors are brought in only for specialized trades such as electrical, plumbing, HVAC, and concrete.
- 1-year workmanship warranty on our labor, with manufacturer warranties on materials passed through to you.
"We are so happy with our deck and patio! Anton (PRG Home Improvement) stands out above and beyond. He is very responsive, kept us updated on progress, took care of all Howard County inspections, provided all docs for our two HOAs, and finished on time! Anton and Dan were friendly, considerate, and consistent with their working hours, keeping noise to a minimum. They completed everything within a few weeks, without working weekends. There were no subcontractors -- Anton & Dan did everything. There were no surprises and they completed everything in the original budget. They were also conscientious of our neighbors when it came to supplies and storage (townhouse community). Meticulous, quality work and they went the extra mile (even managing the HVAC when hardscaping the patio!!). We highly recommend and will hire again for all major renos (kitchen, baths, custom shelves)."
— Mike Morucci, Columbia, MD · Verified Google review
We typically respond within 2–4 hours during business days. What happens next:
- We call you to discuss your project
- We schedule a free in-home consultation
- You receive a detailed written estimate