Kitchen Remodeling in Anne Arundel County, MD
PRG Home Improvement remodels kitchens across Anne Arundel County from Gambrills (MHIC #113057). A full replacement in the same layout, with new cabinets, counters, flooring and electrical brought to code, typically costs $30,000 to $60,000; a refresh that keeps the cabinet boxes starts around $15,000. PRG handles the county permit and inspections.
Kitchen Remodeling Projects in Anne Arundel County
Anne Arundel County Kitchens, Era by Era
Most kitchens we open up in the county fall into one of three groups. The 1960s–1990s colonials and split-foyers of Crofton and Severna Park have solid framing and closed-off kitchens, so a layout change usually means opening the wall to the dining room rather than repairing anything. The 1980s–90s Annapolis-area colonials of Hillsmere Shores, Bestgate and Admiral Heights are where we spend most of our time replacing original builder kitchens.
The NVHomes and Ryan Homes communities — Piney Orchard and Seven Oaks in Odenton, and the 2000s–2020s Hanover communities such as Shipley Homestead and Parkside Reserve — are structurally new but ship with laminate countertops and stock cabinetry, so owners typically upgrade within the first one to three years. In post-war Glen Burnie the order reverses: plumbing and electrical often have to be brought up to code before finishes.
Anne Arundel County Kitchen Permits
Counters, backsplash, paint and cabinet doors do not need a permit. New or relocated circuits, relocated plumbing or gas, and any wall removal do, through the Anne Arundel County Office of Inspections and Permits. Replacing cabinets in the same layout still usually brings an electrical permit, because current code requires dedicated appliance circuits and GFCI protection that older kitchens lack. The building permit fee for kitchen scope is typically $200–$600.
Homes inside Annapolis city limits file with the City of Annapolis instead of the county. Interior kitchen work does not go through HOA architectural review in the county's planned communities. See the Anne Arundel County permit guide for the project-by-project detail.
Opening a Kitchen Wall
Removing a load-bearing wall means an engineer sizes a beam, the framing is temporarily supported while the beam and posts go in, and the county inspects the framing before drywall. The engineered beam is its own line on the quote ($5,000–$15,000). Relocating the sink or range usually comes with it, adding plumbing or gas permits — together these are what move a kitchen into the high tier.
Kitchen Remodeling Cost in Anne Arundel County
PRG's installed prices, the same tiers as the cost guide.
| Tier | Project | Installed cost |
|---|---|---|
| Low | Refresh: cabinets kept, new counters, backsplash, sink, lighting and paintThe cabinet boxes stay (painted or refaced), with new countertops, tile backsplash, sink and faucet, lighting and paint. | $15,000–$25,000 |
| Typical | Full replacement in the same layoutNew semi-custom cabinets, quartz counters, tile backsplash, new flooring, plumbing in place, electrical brought to code, new lighting. | $30,000–$60,000 |
| High | Layout change with wall removal, island with utilities and custom cabinetryA wall comes out with an engineered beam, the sink or range moves, an island gets plumbing and electrical, and cabinetry is custom. | $65,000–$100,000 |
Permit Office and Inspections
Anne Arundel County Office of Inspections and Permits
Building permit fee: $200–$600
- A cosmetic refresh (counters, backsplash, paint, doors) does not normally need a permit.
- New or relocated circuits, relocated plumbing or gas, and any wall removal require a permit with electrical, plumbing and mechanical sub-permits as applicable.
- Replacing cabinets in the same layout still usually brings an electrical permit, because current code requires dedicated appliance circuits and GFCI protection that older kitchens lack.
- Framing inspection. Only for wall removal: the beam, posts and bearing path are checked against the engineer's detail before drywall.
- Electrical rough-in. New circuits, appliance runs and lighting wiring inspected before the walls and ceiling are closed.
- Plumbing and gas rough-in. When the sink, dishwasher, range or gas line moves: piping and venting inspected open, and a gas pressure test.
- Final inspection. GFCI and circuit checks, appliance connections, gas final, and the finished kitchen matching the permit.
Kitchen Remodeling by Town
Each town page covers its own neighborhoods, housing stock and local projects.
- Kitchen Remodeling in Gambrills
- Kitchen Remodeling in Annapolis
- Kitchen Remodeling in Crofton
- Kitchen Remodeling in Crownsville
- Kitchen Remodeling in Millersville
- Kitchen Remodeling in Odenton
- Kitchen Remodeling in Severna Park
- Kitchen Remodeling in Arnold
- Kitchen Remodeling in Davidsonville
- Kitchen Remodeling in Edgewater
- Kitchen Remodeling in Glen Burnie
- Kitchen Remodeling in Hanover
- Kitchen Remodeling in Severn
Kitchen Remodeling in Anne Arundel County: FAQ
- How much does a kitchen remodel cost in Anne Arundel County?
- A full kitchen replacement in the same layout typically costs $30,000 to $60,000 installed by PRG in Anne Arundel County. A refresh that keeps the cabinet boxes starts around $15,000; a layout change with a wall removal and custom cabinetry reaches $100,000. See the kitchen remodel cost guide for what each tier includes.
- Do I need a permit for a kitchen remodel in Anne Arundel County?
- Not for counters, backsplash and paint. Yes for new or relocated circuits, relocated plumbing or gas, and any wall removal — and most full cabinet replacements bring an electrical permit. The fee is typically $200–$600. Homes inside Annapolis city limits file with the City of Annapolis. PRG pulls the permit and schedules the inspections.
- Can PRG remove the wall between my kitchen and dining room?
- Yes. The closed-off kitchens in the county's 1960s–1990s colonials are the usual candidates. An engineer sizes the beam ($5,000–$15,000 as its own line), the county inspects the framing before drywall, and plumbing or gas permits are added if the sink or range moves.
- How long does a kitchen remodel take?
- A refresh takes 2–3 weeks. A full replacement in the same layout takes 4–8 weeks of construction once the permit is issued and materials are on site, and a layout change with a wall removal takes 10–16 weeks. Cabinets are ordered while the permit is in review.
Get a Free In-Home Estimate
The owner measures, checks the plumbing and electrical, and writes a line-item quote with stated allowances.
Who Will Run Your Project
Anton Sergeev — Owner & Lead Craftsman
- MHIC #113057 — licensed & insured in Maryland. Verify license →
- Hands-on in construction since 2010 — electrician, property management, then custom home builders. MHIC licensed since 2017.
- Anton personally performs or supervises the critical finish work on every project — you work with the owner from estimate to final walkthrough.
- Trusted, licensed subcontractors are brought in only for specialized trades such as electrical, plumbing, HVAC, and concrete.
- 1-year workmanship warranty on our labor, with manufacturer warranties on materials passed through to you.
"Anton did an excellent job opening up our kitchen wall. He was communicative, on time and even let our doggy outside when I had to run into work. His craftsmanship was excellent and the kitchen looks great."
— Deanna Segreti, Odenton, MD · Verified Google review
We typically respond within 2–4 hours during business days. What happens next:
- We call you to discuss your project
- We schedule a free in-home consultation
- You receive a detailed written estimate