Bathroom Remodeling in Anne Arundel County, MD
PRG Home Improvement remodels bathrooms across Anne Arundel County from its base in Gambrills (MHIC #113057). A full remodel in the same footprint with a new tiled shower typically costs $15,000 to $30,000; a cosmetic refresh starts around $5,000. The owner scopes every job, and PRG pulls the county permit and schedules each inspection.
Bathroom Remodeling Projects in Anne Arundel County
What Anne Arundel County Bathrooms Usually Need, Era by Era
The county was built in waves, and each wave remodels differently. The 1960s–1990s planned communities — Crofton's colonials and split-foyers, Severna Park's Benfield and Shipley's Choice, Pasadena's Lake Shore and Green Haven — still have many original bathrooms, and they are the county's most common renovation candidates. The framing is solid, so the budget goes into the shower, the waterproofing and the finishes rather than repairs.
Post-war Glen Burnie is the exception: in 1940s–1960s row houses and ranchers, bathroom demolition can uncover knob-and-tube wiring, galvanized plumbing or asbestos that has to be dealt with before tile goes up, and the quote allows for it. At the other end, the NVHomes and Ryan Homes communities in Odenton (Piney Orchard, Seven Oaks) and the newer Hanover communities are structurally new but builder-grade, and the usual first project is replacing the builder tub/shower with a real walk-in shower.
On the larger rural lots around Gambrills, Crownsville and Davidsonville, well and septic systems change how drain locations and water pressure are planned, which matters as soon as a bathroom layout moves.
Anne Arundel County Bathroom Permits
Bathroom permits run through the Anne Arundel County Office of Inspections and Permits. Simple single-trade bathroom work typically approves in 1–2 weeks; the building permit fee for this scope is $75–$300. One wrinkle: homes inside Annapolis city limits file with the City of Annapolis instead of the county — same rules about what needs a permit, different reviewers. The full process is in our Anne Arundel County permit guide.
Interior bathroom work does not go through HOA architectural review, so a Crofton or Piney Orchard bathroom needs only the county permit. Condominium associations are the exception and may require notice for work that touches the building plumbing risers.
How PRG Builds the Shower
Cement board alone is not waterproof, and a shower that relies on it eventually leaks into the framing. Every tiled shower PRG builds gets a bonded waterproofing membrane — Schluter, Wedi or GoBoard — and it is included at the typical tier rather than sold as an upgrade. Our shower waterproofing comparison explains the difference, and shower waterproofing in Gambrills covers the work on its own.
Bathroom Remodeling Cost in Anne Arundel County
PRG's installed prices, the same tiers as the cost guide.
| Tier | Project | Installed cost |
|---|---|---|
| Low | Cosmetic refresh, same footprint, tub or shower keptNew vanity, top and faucet, toilet, lighting, mirror, accessories and paint; the tub or shower surround stays or is resurfaced. | $5,000–$12,000 |
| Typical | Full remodel in the same footprint with a new tile shower or tubEverything removed to the studs where the shower is, a new tiled shower or tub-shower with bonded waterproofing, tile floor, new vanity, fixtures, lighting and exhaust. | $15,000–$30,000 |
| High | Layout change or master bath with relocated plumbing and premium finishesWalls, drains or the toilet move; a curbless or large custom shower, freestanding tub, double vanity, heated floor, frameless glass and new circuits. | $35,000–$90,000 |
Permit Office and Inspections
Anne Arundel County Office of Inspections and Permits
Building permit fee: $75–$300
- A cosmetic refresh (vanity, toilet, fixtures, paint) does not normally need a permit.
- Relocating plumbing, adding or moving a circuit, or changing framing requires a permit with plumbing and electrical sub-permits as applicable.
- Replacing a tub or shower valve in place is usually done under the plumbing sub-permit when the walls are open.
- Plumbing rough-in. When drains or supplies move: the inspector checks the new piping, venting and the shower pan test before waterproofing and tile cover it.
- Electrical rough-in. When circuits are added or moved: wiring for lighting, heated floor, fan and GFCI-protected outlets, inspected before drywall.
- Framing inspection. Only when walls, doors or windows change.
- Final inspection. Fixtures connected, GFCI and fan operation, and the finished work matching the permit.
Bathroom Remodeling by Town
Each town page covers its own neighborhoods, housing stock and local projects.
- Bathroom Remodeling in Gambrills
- Bathroom Remodeling in Annapolis
- Bathroom Remodeling in Crofton
- Bathroom Remodeling in Crownsville
- Bathroom Remodeling in Millersville
- Bathroom Remodeling in Odenton
- Bathroom Remodeling in Severna Park
- Bathroom Remodeling in Arnold
- Bathroom Remodeling in Davidsonville
- Bathroom Remodeling in Edgewater
- Bathroom Remodeling in Glen Burnie
- Bathroom Remodeling in Hanover
- Bathroom Remodeling in Pasadena
- Bathroom Remodeling in Severn
Bathroom Remodeling in Anne Arundel County: FAQ
- How much does a bathroom remodel cost in Anne Arundel County?
- A full bathroom remodel in the same footprint with a new tiled shower typically costs $15,000 to $30,000 installed by PRG in Anne Arundel County. A cosmetic refresh that keeps the tub or shower starts around $5,000; a layout change or master bath with relocated plumbing reaches $90,000. The bathroom remodel cost guide breaks down each tier.
- Do I need a permit to remodel a bathroom in Anne Arundel County?
- Not for a cosmetic refresh (vanity, toilet, fixtures, paint). Yes once plumbing is relocated, a circuit is added or moved, or framing changes. The building permit fee for this scope is typically $75–$300, and homes inside Annapolis city limits file with the City of Annapolis rather than the county. PRG pulls the permit either way.
- How long does a bathroom remodel take in Anne Arundel County?
- Most full bathroom remodels take 2 to 6 weeks from demolition to final walk-through, depending on the tile work and material lead times. When the scope needs a permit, allow 1–2 weeks for the county to approve simple single-trade work before demolition starts.
- Which Anne Arundel County towns does PRG remodel bathrooms in?
- The whole county. PRG is based in Gambrills, and even Hanover, Glen Burnie and Laurel are roughly 15–20 minutes away. The towns with their own bathroom remodeling pages are listed on this page.
Get a Free In-Home Estimate
The owner measures, checks the plumbing and electrical, and writes a line-item quote with stated allowances.
Who Will Run Your Project
Anton Sergeev — Owner & Lead Craftsman
- MHIC #113057 — licensed & insured in Maryland. Verify license →
- Hands-on in construction since 2010 — electrician, property management, then custom home builders. MHIC licensed since 2017.
- Anton personally performs or supervises the critical finish work on every project — you work with the owner from estimate to final walkthrough.
- Trusted, licensed subcontractors are brought in only for specialized trades such as electrical, plumbing, HVAC, and concrete.
- 1-year workmanship warranty on our labor, with manufacturer warranties on materials passed through to you.
"Anton was very professional and offered a reasonable price for a full bathroom and kitchen demolition and renovation. He worked closely with me to achieve the aesthetic that I envisioned and even went as far as to pick up larger items from Home Depot/Lowes on my behalf. I love the way my new kitchen and bathroom look! Would highly recommend Anton and PRG Contractors!"
— Leigha Carryl, Annapolis, MD · Verified Google review
We typically respond within 2–4 hours during business days. What happens next:
- We call you to discuss your project
- We schedule a free in-home consultation
- You receive a detailed written estimate