Skip to main content
← All cost guides

Bathroom Remodel Cost in Maryland: What a Bathroom Remodel Costs in Anne Arundel & Howard County

By Anton Sergeev, Owner — MHIC #113057

How much does a bathroom remodel cost in Maryland?

A bathroom remodel in Anne Arundel and Howard County, Maryland typically costs $15,000–$30,000 installed by PRG Home Improvement. Cosmetic refresh, same footprint, tub or shower kept starts around $5,000; layout change or master bath with relocated plumbing and premium finishes reaches $90,000. Prices reviewed September 15, 2026.

Bathroom remodel with white shaker vanity and round mirror by PRG Home Improvement in Maryland

Want a real number for your bathroom remodel?

Leave your name and phone. Anton — the owner, not a call center — calls back within one business day with a ballpark for your home.

Call 443-856-5379

Or request a free in-home estimate.

These are installed prices from PRG Home Improvement (MHIC #113057) for bathroom work in Anne Arundel and Howard County. They include labor, standard materials, bonded shower waterproofing, permit handling and inspections. Fixture and tile allowances are stated in every quote so an upgrade is a visible line, not a surprise.

The tier a bathroom lands in is decided by two things: whether the plumbing stays where it is, and whether the shower or tub area is rebuilt. Everything else is finish level.

Bathroom Remodeling cost by tier

Installed prices: labor, standard materials, permit handling and inspections. The right-hand column is what puts a project in that tier.

Bathroom Remodeling price tiers in Anne Arundel and Howard County, Maryland
Tier Project Installed cost What puts a project here
Low Cosmetic refresh, same footprint, tub or shower kept New vanity, top and faucet, toilet, lighting, mirror, accessories and paint; the tub or shower surround stays or is resurfaced. $5,000–$12,000
  • No plumbing moves and no new circuits, so no permit is normally required
  • The tub or shower is kept, re-caulked or resurfaced rather than rebuilt
  • Vanity and toilet swap in place; flooring stays or is replaced with a floating product
Typical Full remodel in the same footprint with a new tile shower or tub Everything removed to the studs where the shower is, a new tiled shower or tub-shower with bonded waterproofing, tile floor, new vanity, fixtures, lighting and exhaust. $15,000–$30,000
  • The shower or tub area is rebuilt with a bonded waterproofing system (Schluter KERDI, Wedi or GoBoard) and new tile
  • Tile floor, new vanity and top, new toilet, fixtures and lighting
  • Plumbing stays in its current locations; valves and drains are replaced in place
  • Exhaust fan sized to the room and vented outside
High Layout change or master bath with relocated plumbing and premium finishes Walls, drains or the toilet move; a curbless or large custom shower, freestanding tub, double vanity, heated floor, frameless glass and new circuits. $35,000–$90,000
  • Relocated drains, supply lines or the toilet, which brings a plumbing permit and rough-in inspections
  • A curbless or oversized custom shower with a linear drain, bench and multiple niches
  • Freestanding tub, double vanity, heated floor and frameless glass
  • New dedicated circuits for heated floor, lighting zones or a towel warmer
  • Wall or door changes, sometimes borrowing space from an adjacent closet

What a quote includes, and what is commonly left out

The gap between two quotes is usually in this list, not in the labor rate. Ask any contractor for both columns before comparing numbers.

Low tier — Cosmetic refresh, same footprint, tub or shower kept ($5,000–$12,000)

Included in a PRG quote

  • Vanity, countertop, sink, faucet, toilet and accessories installed
  • Lighting and exhaust fan replaced on existing circuits
  • Paint, mirror, caulk and trim

Commonly excluded, quoted separately

  • Tile work of any kind
  • Any plumbing relocation or new electrical circuit
  • Repairs to subfloor or framing found once the old vanity or toilet is out

Typical tier — Full remodel in the same footprint with a new tile shower or tub ($15,000–$30,000)

Included in a PRG quote

  • Demolition and disposal, subfloor check and repair at the wet areas
  • Bonded waterproofing membrane behind every wet wall and under the pan
  • Shower or tub, valve, tile, niche, vanity, top, sink, toilet, lighting, fan, paint
  • Permit and inspections when the county requires them for the plumbing or electrical scope

Commonly excluded, quoted separately

  • Moving the toilet, shower drain or vanity plumbing
  • Heated floors, frameless glass and freestanding tubs, quoted as add-ons
  • Structural changes to walls, doors or windows
  • Fixture and tile selections above the stated allowance

High tier — Layout change or master bath with relocated plumbing and premium finishes ($35,000–$90,000)

Included in a PRG quote

  • Everything in the typical tier
  • Plumbing relocation and new circuits under permit, with rough-in and final inspections
  • Custom shower construction, curbless pan and linear drain where specified
  • Heated floor system, frameless glass and premium fixtures at the stated allowance

Commonly excluded, quoted separately

  • Moving plumbing stacks or venting through finished floors below
  • Window replacement and exterior wall changes
  • Steam generators and other specialty mechanical systems unless listed

Line items outside the tiers

Item Cost When it applies
Heated tile floor $1,500–$3,000 Electric mat under the tile on its own circuit and thermostat.
Frameless glass shower enclosure $800–$1,800 Measured after tile; a separate line so the size and hardware are visible.
Tub-to-shower conversion $3,500–$14,000 Removing a tub and building a tiled shower in its footprint. Covered in more detail in the tub-to-shower conversion guide.

Permits, inspections and HOA review in Anne Arundel and Howard County

Anne Arundel County

Anne Arundel County Office of Inspections and Permits

Building permit fee: $75–$300

  • A cosmetic refresh (vanity, toilet, fixtures, paint) does not normally need a permit.
  • Relocating plumbing, adding or moving a circuit, or changing framing requires a permit with plumbing and electrical sub-permits as applicable.
  • Replacing a tub or shower valve in place is usually done under the plumbing sub-permit when the walls are open.

Howard County

Howard County Department of Inspections, Licenses and Permits (DILP)

Building permit fee: $100–$350

  • Howard County requires a permit for any plumbing relocation, electrical circuit change or structural alteration; like-for-like fixture replacement does not need one.
  • Plumbing and electrical inspections are scheduled at rough-in, before the walls are closed, and at final.

Inspection sequence

  1. Plumbing rough-in. When drains or supplies move: the inspector checks the new piping, venting and the shower pan test before waterproofing and tile cover it.
  2. Electrical rough-in. When circuits are added or moved: wiring for lighting, heated floor, fan and GFCI-protected outlets, inspected before drywall.
  3. Framing inspection. Only when walls, doors or windows change.
  4. Final inspection. Fixtures connected, GFCI and fan operation, and the finished work matching the permit.

HOA review

Interior bathroom work does not go through HOA architectural review. Condominium associations are the exception: many require notice for work that involves the building plumbing risers, proof of contractor insurance, and set working hours and elevator rules.

Full breakdown: sizes, materials, line items and hidden costs

The detail behind the tiers. Figures here are PRG's published prices for the same work and are reviewed on the same date as the tiers above.

How Much Does a Bathroom Remodel Cost by Bathroom Type?

The type of bathroom matters as much as the scope because the fixtures and square footage are different. These are typical Maryland prices for a standard remodel (new tile, new fixtures, same layout).

Bathroom typeTypical sizeAverage cost in MD
Powder room (half bath, no shower/tub)15–25 sq ft$4,500 – $7,500
Half bath with shower25–35 sq ft$8,000 – $13,000
Full bath (tub/shower, vanity, toilet)35–50 sq ft$14,000 – $22,000
Jack-and-Jill bath50–70 sq ft$18,000 – $28,000
Master / primary bath70–120 sq ft$25,000 – $45,000
Luxury master with separate tub and walk-in shower100–200 sq ft$45,000 – $90,000+

Bethesda and Chevy Chase prices run higher than this — Insite Remodeling lists $35,000–$75,000 for a standard hall bathroom in Bethesda and $75,000–$200,000 for a primary bath. In Anne Arundel and Howard Counties the same scopes typically run 20–35% less because of lower overhead and a less luxury-skewed buyer base.

Cost per Square Foot for a Bathroom Remodel in Maryland

Maryland bathroom remodels run $150 to $400 per square foot for a standard remodel, with most projects landing around $300/sq ft. Luxury remodels with custom tile, glass, and high-end fixtures can push past $500/sq ft.

Bathroom sizeStandard ($250/sq ft)Mid-range ($325/sq ft)High-end ($425/sq ft)
40 sq ft$10,000$13,000$17,000
60 sq ft$15,000$19,500$25,500
80 sq ft$20,000$26,000$34,000
100 sq ft$25,000$32,500$42,500
150 sq ft$37,500$48,750$63,750

Measure your bathroom and multiply. This will get you within ±15% of a real bid for most projects that keep the existing layout.

What Does Each Part of a Bathroom Remodel Cost?

Here's how the line items break down on a typical Maryland bathroom remodel. Prices are installed, including labor and standard materials.

Demolition and disposal

ItemCost in MD
Cosmetic demo (vanity, toilet, flooring only)$300 – $800
Full gut demo to studs and subfloor (35–50 sq ft bath)$1,000 – $2,500
Debris haul-off and dump fees$400 – $800

Demo on a standard full bath is one to two days of work. Plaster-and-lath walls (common in pre-1950 Annapolis and Ellicott City homes) demo slower than drywall and add $300–$900 to this line.

Plumbing rough-in

ItemCost in MD
New shower/tub valve, same location$600 – $1,200
Tub-to-shower conversion rough-in (drain + valve)$800 – $1,800
Moving a toilet, sink, or shower drain$1,500 – $3,500
Re-piping bathroom supply lines (galvanized to PEX)$500 – $1,800

Rough-in is the part of the budget that keeping your existing layout protects. Every fixture that stays where it is, is a rough-in line you don't pay.

Tub, shower, and shower pan

ItemInstalled cost in MD
New acrylic tub/shower combo (prefab)$1,500 – $3,500
Tub-to-shower conversion$3,500 – $7,000
Walk-in shower with prefab base + tile walls$4,500 – $8,500
Custom tile shower with mud-bed or foam pan$6,500 – $12,000
Curbless / zero-entry shower with linear drain$8,000 – $14,000
Freestanding soaking tub (tub only, plumbing extra)$2,500 – $6,000

The shower is almost always the most expensive single element, and the part of it you'll never see — the waterproofing — is what decides whether it lasts twenty years or eight.

Shower waterproofing

ItemInstalled cost in MD
Bonded waterproof board, tub surround (3 walls)$800 – $1,600
Full walk-in shower envelope (walls, pan, curb, integrated drain)$1,500 – $3,200
Curbless shower waterproofing with linear drain integration$2,200 – $4,000

Every shower I build gets a bonded waterproofing system — Schluter KERDI-BOARD, Wedi, GoBoard, or Laticrete Hydro Ban Board, depending on the job — where the board itself is the waterproof membrane and the drain connects mechanically to the walls as one sealed envelope. Never bare cement board behind tile, and never a roll-on membrane whose coverage nobody can verify once the tile is up. On a bid sheet this line looks optional, because Durock and a bucket of RedGard cost less. It isn't optional. Skipped or botched waterproofing is the #1 reason Maryland bathrooms get gutted a second time in 5–8 years, and the tear-out costs more than the whole line item did.

Vanity, countertop, and sink

ItemInstalled cost in MD
Stock 24"–30" single vanity (cabinet + top + sink)$600 – $1,400
Stock 36"–48" single vanity$900 – $2,200
Stock 60"–72" double vanity$1,800 – $3,800
Semi-custom or quartz-top vanity (any size)$2,500 – $5,500
Fully custom built-in vanity$4,000 – $9,000+

Quartz tops in Maryland run $50–$80 per square foot installed. Marble runs $70–$190 per square foot. Stock vanities from the big-box stores are fine for most projects; custom is worth it when the wall length doesn't match a stock size or you want a furniture-style piece.

Toilet, fixtures, and trim

ItemInstalled cost
Standard two-piece toilet$400 – $800
Comfort-height / elongated upgrade$600 – $1,200
Macerating toilet (basement bathrooms with no drain below grade)$1,400 – $2,200
Faucet (vanity)$200 – $600
Shower valve and trim$400 – $900
Towel bars, robe hooks, paper holder set$150 – $400

Maryland has a lot of older homes with basement bathrooms below the main sewer line. If yours is one of them, a macerating toilet (Saniflo or similar) costs more than a standard install but is worth every dollar versus the cost of breaking the slab.

Flooring

MaterialInstalled cost per sq ft
Ceramic / porcelain tile$10 – $20
Luxury vinyl plank or tile (LVP/LVT)$5 – $12
Natural stone (marble, travertine, slate)$20 – $50
Heated floor (electric mat, add-on)$12 – $20
Sheet vinyl or linoleum$4 – $10

For a 50 sq ft full bathroom, expect $500–$1,000 for the floor in vinyl, $800–$1,800 in standard porcelain tile, and $1,500–$3,000+ in natural stone.

Lighting, electrical, and exhaust

ItemInstalled cost
Vanity light fixture$150 – $500
Recessed can lights (per can, IC-rated for bathrooms)$150 – $300
New exhaust fan (properly vented to exterior)$300 – $700
GFCI outlet replacement$150 – $250
Full circuit upgrade or new dedicated circuit$400 – $1,200

If you have a Maryland home built before about 1985 and you've never updated the bathroom electrical, plan on at least one GFCI upgrade and a properly vented exhaust fan. Builder-grade vent fans from the 70s and 80s were frequently terminated in the attic — that's not just a code issue, it's the root cause of attic mold in a lot of older Crofton, Severna Park, and Ellicott City homes.

What Percent of a Bathroom Remodel Is Labor?

Labor accounts for 40–60% of total cost on most Maryland bathroom remodels. On a $20,000 project, that's $8,000–$12,000 in labor and $8,000–$12,000 in materials. Custom tile work and complex plumbing push labor toward the high end; prefab fixtures and a stock vanity push it toward the low end.

The labor breakdown on a typical 50 sq ft full bathroom remodel looks roughly like this:

  • Demolition and disposal: 1–2 days
  • Plumbing rough-in (if any layout change): 1–2 days
  • Electrical and fan: 0.5–1 day
  • Framing / drywall / backer board / waterproofing: 2–3 days
  • Tile setting (floor + shower): 3–5 days
  • Trim, fixtures, vanity, finish: 2–3 days

That's why bathroom remodels in Maryland typically take 2 to 6 weeks from demo to final walk-through. See my full Maryland bathroom remodel timeline guide for a phase-by-phase schedule.

Hidden Costs in a Maryland Bathroom Remodel

This is the section the marketplace sites can't write because they're not the ones opening the wall. After 200+ Maryland bathrooms, here's what shows up on demo day on a regular basis:

Hidden issueTypical added cost
Rotten subfloor under tub or toilet flange$400 – $1,500
Cast iron drain stack cracked or corroded$600 – $2,500
Galvanized supply lines (common in pre-1965 homes)$500 – $1,800 to re-pipe
Knob-and-tube wiring in older Annapolis / Edgewater / Severna Park homes$1,000 – $3,500
Plaster-and-lath walls instead of drywall (extra demo time)$300 – $900
Mold remediation behind tile or under tub$800 – $3,500
Out-of-square or out-of-plumb walls requiring framing correction$400 – $1,200
Asbestos floor tile or pipe wrap requiring abatement$1,200 – $4,000

A good contractor builds a 10–15% contingency into your project budget for exactly these surprises. If you're getting a $15,000 estimate, plan for $17,000 in cash available. I write all my contracts with a defined change-order process so if something shows up behind the wall, you see the cost, you approve it, and the work moves forward without surprises at the end.

What the Cost Aggregators Don't Tell You

Type "bathroom remodel cost" into a search engine and the top results are national aggregator sites quoting national averages. Two problems with that. First, a national average blends Mississippi labor rates with San Francisco ones — it doesn't price a bathroom in Crofton or Columbia. Second, and more important: those sites price the visible scope. They can't tell you what a low bid quietly leaves out, because they've never carried one.

When two bids for the same bathroom are $6,000 apart, the cheaper one is usually missing one or more of these:

  • A real waterproofing system. Tile straight over cement board, or a single thin coat of roll-on membrane, instead of a bonded system like Schluter, Wedi, or GoBoard. Invisible on day one, catastrophic by year eight.
  • Permits. "We don't need one for this" saves the fee and the inspection — and leaves you holding an unpermitted plumbing alteration at resale.
  • An exhaust fan actually ducted outside. Terminating the vent in the attic is faster and invisible. It's also how attic mold starts.
  • Demo disposal, floor leveling, and the contingency process. If the bid doesn't say who pays when the subfloor comes up rotten, you do — at a price negotiated mid-project when you can't walk away.

Before comparing totals, compare scopes line by line. A lower number for a narrower scope isn't a better price — it's a different, smaller project wearing the same name.

What's the ROI on a Maryland Bathroom Remodel?

According to the 2025 Cost vs. Value Report from Remodeling Magazine and Zonda, midrange bathroom remodels nationally return 74–80% of their cost at resale — among the highest ROI of any interior renovation. Upscale and luxury remodels typically return 42–55%.

Remodel scopeNational ROI (2025 Cost vs. Value)Example: $20,000 project
Minor / cosmetic refresh70–85%Adds ~$15,000 in resale value
Midrange standard remodel74–80%Adds ~$16,000 in resale value
Universal design / accessibility60–65%Adds ~$12,500 in resale value
Upscale / luxury remodel42–55%Adds ~$9,500 in resale value

The Mid-Atlantic region (including Maryland) tends to track close to the national average. In strong submarkets like Severna Park, Crofton, Annapolis, Davidsonville, and Clarksville, return on a midrange remodel can hit the top of the range because buyer expectations are high and an outdated bathroom is a deal-breaker for a lot of buyers.

The takeaway: midrange beats luxury for ROI. Unless you're remodeling for personal enjoyment in a home you plan to keep long-term, don't overbuild beyond your neighborhood's comp ceiling.

How to Save Money on a Bathroom Remodel in Maryland

  1. Keep the layout. Moving the toilet, shower drain, or sink adds $1,500–$3,500 to the project before tile is even back on the wall. Unless the existing layout is unusable, leave it.
  2. Mid-range materials, not luxury. Quartz beats marble for resale ROI and durability. Stock vanities from a real cabinet supplier (not particle-board big-box) beat custom for most rooms.
  3. DIY the demo, paint, and fixture install. A homeowner can reasonably save $1,500–$3,000 by handling demolition, painting, and toilet/vanity install themselves and leaving the tile, plumbing, and waterproofing to a pro.
  4. Bundle with another project. If you're already pulling permits for a kitchen or basement, adding a bathroom to the same job saves on permit fees and contractor mobilization.
  5. Look for utility rebates. BGE offers rebates on certain WaterSense fixtures and high-efficiency exhaust fans through its smart energy program. The Maryland Energy Administration (MEA) has appliance and efficiency incentives that occasionally apply to bathroom upgrades — check energy.maryland.gov for current programs.
  6. Hire an owner-operator contractor for smaller projects. A solo licensed contractor like me has lower overhead than a design-build firm — typically 15–25% less on the same scope of work because there's no project manager, no in-house designer, and no showroom to pay for. The trade-off is a smaller schedule of available start dates.

How to Finance a Bathroom Remodel in Maryland

Most Maryland homeowners pay for a bathroom remodel through one of four routes:

  • Home equity line of credit (HELOC). If you have equity in your home, this is usually the cheapest financing. Interest is variable but typically lower than personal loans, and interest may be tax-deductible if the funds are used for home improvement (consult your tax preparer).
  • Cash-out refinance. Worth considering if current mortgage rates are at or below your existing rate, otherwise a HELOC is usually cheaper.
  • Home improvement loan (unsecured personal loan). Faster to close than a HELOC, fixed rate, but higher interest. Good option if you don't have equity yet.
  • FHA 203(k) renovation loan. If you're buying a home that needs work, a 203(k) lets you finance the remodel into the purchase mortgage. Useful for distressed properties.

I don't take credit cards for full projects (the processing fees would be passed back to you anyway), but most clients pay by check or ACH on a milestone schedule: deposit, mid-project, and final upon completion.

Get a real number for your bathroom remodel

The tiers above are how PRG scopes bathroom remodel projects, and the ranges are our installed prices. The number for your home depends on what is already there and what you choose. Describe the project to the AI estimator for a range now, or book an in-home estimate for a line-item quote.

Describe your project to the AI estimator →

Bathroom Remodeling cost questions

How much does a bathroom remodel cost in Maryland?
In Anne Arundel and Howard County, a full bathroom remodel in the same footprint with a new tiled shower typically costs $15,000 to $30,000 installed by PRG. A cosmetic refresh that keeps the tub or shower starts around $5,000; a layout change or master bath with relocated plumbing and premium finishes reaches $90,000. Prices reviewed September 15, 2026.
What is included in a bathroom remodel quote from PRG?
Demolition, subfloor repair at the wet areas, bonded waterproofing behind every wet wall and under the pan, the shower or tub with valve and tile, vanity and top, toilet, lighting, exhaust fan, paint, and the permit and inspections when the scope needs them. Fixture and tile allowances are stated in the quote.
Do I need a permit to remodel a bathroom in Anne Arundel or Howard County?
Not for a cosmetic refresh. Yes in both counties once plumbing is relocated, a circuit is added or moved, or framing changes. Anne Arundel County runs permits through the Office of Inspections and Permits and Howard County through DILP; PRG pulls the permit and schedules the rough-in and final inspections.
What moves a bathroom from the typical tier to the high tier?
Moving plumbing is the biggest step, because it opens the floor and brings a plumbing permit. After that it is the shower itself: curbless pans, linear drains, benches and large-format tile add labor, and heated floors, freestanding tubs, double vanities and frameless glass add material.
Why does PRG insist on a bonded waterproofing membrane?
Cement board alone is not waterproof, and Maryland humidity punishes a shower that relies on it. Schluter, Wedi or GoBoard behind the tile is included at the typical tier rather than offered as an upgrade because it is the difference between a shower that lasts and one that leaks into the framing.
How do I get a real number for my bathroom?
Describe the bathroom to the AI project estimator for a range now, or call 443-856-5379 for an in-home estimate. The owner checks the existing plumbing and framing and writes a line-item quote with stated allowances.

Who Will Run Your Project

Anton Sergeev, owner and lead craftsman of PRG Home Improvement LLC

Anton Sergeev — Owner & Lead Craftsman

  • MHIC #113057 — licensed & insured in Maryland. Verify license →
  • Hands-on in construction since 2010 — electrician, property management, then custom home builders. MHIC licensed since 2017.
  • Anton personally performs or supervises the critical finish work on every project — you work with the owner from estimate to final walkthrough.
  • Trusted, licensed subcontractors are brought in only for specialized trades such as electrical, plumbing, HVAC, and concrete.
  • 1-year workmanship warranty on our labor, with manufacturer warranties on materials passed through to you.

"Anton has done many jobs for us, including bathroom remodel, cabinet installation, built-ins, painting, fan and light fixture installation. I cannot say enough about him! He is communicative, creative, neat, and completes projects in a timely manner. I can't wait for him to do more projects for us!"

— Kelly Aziz, Odenton, MD · Verified Google review

We typically respond within 2–4 hours during business days. What happens next:

  1. We call you to discuss your project
  2. We schedule a free in-home consultation
  3. You receive a detailed written estimate

See our completed projects →