Kitchen Remodeling in Maryland

Expert kitchen remodeling in Anne Arundel & Howard Counties, MD. Licensed & insured. Free estimates. Call 443-856-5379 to start your project.

Call 443-856-5379 for a free estimate. Licensed & insured.

The kitchen is the center of your home and the renovation most likely to increase your property value. PRG delivers kitchen remodels ranging from cosmetic refreshes to complete transformations with new layouts, custom cabinetry, and premium countertops.

Kitchen Remodeling Services We Offer

  • Complete kitchen gut renovations with layout redesign
  • Cabinet refacing, refinishing, or full replacement
  • Countertop installation in quartz, granite, butcher block, and laminate
  • Load-bearing wall removal for open-concept conversions
  • Backsplash, flooring, and lighting upgrades
  • Appliance installation and electrical circuit additions

Our Kitchen Remodeling Process

During your free estimate, we assess your kitchen structure, discuss layout options, and help you prioritize upgrades within your budget. We coordinate cabinet orders (6-10 week lead times for custom), schedule trades, and manage the renovation so your kitchen downtime is minimized. Every project includes a detailed timeline with milestones.

Kitchen Remodeling FAQ

How much does a kitchen remodel cost in Maryland?
Kitchen renovation costs in Anne Arundel and Howard County typically range from $30,000-$50,000 for a cosmetic update (cabinet refacing, new countertops, backsplash, appliances) to $75,000-$150,000+ for a full renovation with custom cabinetry, layout changes, and high-end finishes. We'll help you prioritize upgrades that deliver the best value for your budget.
How long does a kitchen remodel take?
Kitchen renovations typically take 8-14 weeks. A cosmetic refresh (cabinet refacing, new countertops, backsplash) can be done in 4-6 weeks. Full renovations with new cabinets, layout changes, and appliance upgrades take 10-14 weeks. Custom cabinetry has the biggest timeline impact with 6-10 week lead times.
Can you remove a wall to open up my kitchen?
Often yes, but it depends on whether the wall is load-bearing. Load-bearing walls can be removed but require installing a support beam, adding $3,000-$10,000+ for structural work. We assess your home's structure during the estimate and can bring in a structural engineer if needed. Opening kitchens to living/dining areas is one of our most requested renovations.
Should I refinish, reface, or replace my kitchen cabinets?
Refinishing (painting/staining existing doors) works if cabinets and doors are solid and you like the layout ($3,000-$8,000). Refacing (new doors on existing boxes) is good when boxes are solid but you want a new look ($8,000-$15,000). Full replacement makes sense if cabinets are damaged, poorly configured, or you're changing the layout ($15,000-$50,000+).
What countertop material do you recommend?
Quartz is our most popular recommendation—durable, non-porous, no sealing needed ($50-$100/sq ft installed). Granite remains popular with unique natural patterns ($40-$80/sq ft). Butcher block adds warmth but requires maintenance ($40-$60/sq ft). Modern laminate is budget-friendly and much improved ($15-$40/sq ft). We'll help you balance aesthetics, durability, and budget.